ONGOING | PROJECT MANAGEMENT |
Project | 5 LEVEL RESIDENTIAL WITH STRUCTURAL STEEL FRAME |
Client | RFK HOLDINGS INC |
Location | MA. LUISA SUBDIVISION PHASE 4, BANILAD, CEBU, PHILIPPINES |
Structure | 1 RESIDENTIAL STRUCTURE (5 LEVEL STREEL FRAME WRAPPED WITH INSULATED GLASS UNIT) 1 MULTIPURPOSE STRUCTURE (3 LEVEL STEEL FRAME WRAPPED WITH WOOD SLATS) CONNECTING BRIDGE FRAME COVERED WITH MERBAU DECK. |
Area | 1,500 SQM |
Role in Project | PRE-CONSTRUCTION PROJECT COSTING, DUE DILIGENCE, REGULATORY & BANK SUBMITTALS, BID TENDER DOCUMENTS, BIDDING, EVALUATION, PROJECT MANAGEMENT |
Year | 2018 - 2023 - STRUCTURE GLASS WORKS, TRAVERTINE FLOORING 2023 - 2024 - HIGH END INTERIOR WORKS, POOL |